PBS INSTRUCTION 100-01
|
Engineering and Materials Administration
|
|
২
|
PBS INSTRUCTION 100-03
|
Short Listing of Architectural & Engineering Consultants
|
|
৩
|
PBS INSTRUCTION 100-04
|
Prequalification of Electrical Construction Contractor
|
|
৪
|
PBS INSTRUCTION 100-05
|
Service, Repairing and Testing of Equipment/ Instrument of Electrical Network System
|
|
৫
|
PBS INSTRUCTION 100-06
|
Construction Methods for PBS Electrical Network System, Building and Civil Works
|
|
৬
|
PBS INSTRUCTION 100-08
|
Preparation of Plans and Specifications for Electrical Network Facilities for PBS
|
|
৭
|
PBS INSTRUCTION 100-09
|
Appointment of Consultant for Local Electrical Consultancy Services
|
|
৮
|
PBS INSTRUCTION 100-10
|
Pre-Construction and Construction Progress Co-Ordination Meeting
|
|
৯
|
PBS INSTRUCTION 100-12
|
Function of BREB/PBS Engineers/Officers/Inspectors for Construction of Electric Network System and Civil Works
|
|
১০
|
PBS INSTRUCTION 100-13/
BREB INSTRUCTION 500-03
|
Close-Out Procedure for the Contract Construction of Electrical Network System/Facilities
|
|
১১
|
PBS INSTRUCTION 100-14/
BREB INSTRUCTION 500-04
|
Procedure and Documents for Closing Out the Civil Works (New & Maintenance) Construction Contract
|
|
১২
|
PBS INSTRUCTION 100-15
|
Store Operation Manual
|
|
১৩
|
PBS INSTRUCTION 100-16
|
Insurance Coverage and Bond Requirements for BREB/PBS’s Contractors
|
|
১৪
|
PBS INSTRUCTION 100-17
|
PBS’s Sub-Station & Electric Line’s Materials and Transformer’s Repairing/ Servicing/ Testing
|
|
১৫
|
PBS INSTRUCTION 100-18
|
Power Interruption Recording and Reporting Procedure
|
|
১৬
|
PBS INSTRUCTION 100-19/
BREB INSTRUCTION 300-49
|
Load Management
|
|
১৭
|
PBS INSTRUCTION 100-20/
BREB INSTRUCTION 500-07
|
Energization and Commissioning of Electric Network System (Electric Lines or Lines Section and Sub-Station)
|
|
১৮ |
PBS INSTRUCTION 100-21 |
PBS INSTRUCTION 100-21 |
|
১৯
|
PBS INSTRUCTION 100-22
|
Adequate Grounding on PBS Distribution System
|
|
২০
|
PBS INSTRUCTION 100-23
|
System Plans and Construction Works Plans for Electric Network Systems
|
|
২১
|
PBS INSTRUCTION 100-24
|
Voltage and Current Investigations
|
|
২৪
|
PBS INSTRUCTION 100-25/
BREB INSTRUCTION 500-08
|
Materials Coding Procedures
|
|
২৫
|
PBS INSTRUCTION 100-26/
PBS INSTRUCTION 300-05
|
Power Factor Measurements
|
|
২৬
|
PBS INSTRUCTION 100-27
|
Stores Management Manual
|
|
২৭
|
PBS INSTRUCTION 100-28
|
Standard Specifications and Drawing for 6.35/11 KV Line Constructions
|
|
২৮
|
PBS INSTRUCTION 100-29
|
Substation Operation, Inspection and Maintenance
|
|
২৯
|
PBS INSTRUCTION 100-30
|
Distribution Operation, Inspection and Maintenance
|
|
৩০
|
PBS INSTRUCTION 100-31/
BREB INSTRUCTION 500-05
|
Responsibilities of BREB and PBS for Operation, Construction & Outage of Electric Network System
|
|
৩১
|
PBS INSTRUCTION 100-32
|
Tool and Work Equipment Administration
|
|
৩২
|
PBS INSTRUCTION 100-33/
BREB INSTRUCTION 500-06
|
Material Administration Policies and Responsibilities
|
|
৩৩
|
PBS INSTRUCTION 100-35
|
বিতরণ ট্রান্সফরমার স্থাপন, প্রতি স্থাপন, আপগ্রেডিং ও ভাড়ায় ব্যবহার বিষয়ে নীতিমালা
|
|
৩৪
|
PBS INSTRUCTION 100-37/
BREB INSTRUCTION 500-09
|
Electrical System Take Over Policy and Procedure
|
|
৩৫
|
PBS INSTRUCTION 100-38
|
Management of Consumer Complaints
|
|
৩৬
|
PBS INSTRUCTION 100-39/
BREB INSTRUCTION 500-10
|
Standards for the Power Utilization of Three-Phase Meters
|
|
৩৭
|
PBS INSTRUCTION 100-40
|
Meter Installation, Test, Repair and Sealing Policy
|
|
৩৮
|
PBS INSTRUCTION 100-41
|
Construction/Rehabilitation of Electric Facilities by PBS
|
|
৩৯
|
PBS INSTRUCTION 100-42/
BREB INSTRUCTION 500-11
|
Extension of Electrical Lines on Deposit Work Basis
|
|
৪০ |
PBS INSTRUCTION 100-45 |
Standard Specifications and Drawing for 33 KV Line Constructions |
|
৪১ |
PBS INSTRUCTION 100-47 |
Inter Project Materials Transaction Policy |
|
৪২
|
PBS INSTRUCTION 100-49
|
PBS Hot Line Work Administration
|
|
৪৩
|
PBS INSTRUCTION 100-50
|
PBS Hot Line Work Operations
|
|
৪৪
|
PBS INSTRUCTION 100-51/
BREB INSTRUCTION 700-13
|
First in First Out Material Issue
|
|
৪৫
|
PBS INSTRUCTION 100-52
|
|
|
৪৬
|
PBS INSTRUCTION 100-53/
BREB INSTRUCTION 500-22
|
Storage and Handing of Timer Products
|
|
৪৭
|
PBS INSTRUCTION 100-54/
BREB INSTRUCTION 500-25
|
Standard for Inspection, Evaluation and Treatment of Standing Wood Poles
|
|
৪৮
|
PBS INSTRUCTION 100-57
|
পবিসসমূহের প্রকল্প বহির্ভূত এবং নিজস্ব অর্থায়নে পূর্ত নির্মান/ রক্ষাণাবেক্ষণ কাজ সম্পাদনের নীতিমালা ও পদ্ধতি
|
|
৪৯
|
PBS INSTRUCTION 100-58
|
পল্লী বিদ্যুৎ সমিতিসমূহ কর্তৃক পরিচালন, রক্ষাণাবেক্ষণ ও সিস্টেম উনয়ন কাজের মালামাল ক্রয় নীতিমালা
|
|
৫০
|
PBS INSTRUCTION 100-59/
PBS INSTRUCTION 300-60
|
Engineering & Operations Record Update Process
|
|
৫১
|
PBS INSTRUCTION 100-60
|
Development and Management of GIS for PBS Service Area
|
|
৫২
|
PBS INSTRUCTION 100-61
|
Guideline for Engineering Assessment of Taken-Over Facilities from other Utilities/ Companies/Organizations
|
|
৫৩
|
PBS INSTRUCTION 100-62
|
Procurement of GIS Developer Consultant
|
|
৫৪
|
PBS INSTRUCTION 100-63
|
Procurement of GIS Updating Consultant
|
|
৫৫
|
PBS INSTRUCTION 100-64
|
পল্লী বিদ্যুৎ সমিতিসমূহ কর্তৃক ডিপোজিট ওয়ার্কের মালামাল ক্রয় নীতিমালা
|
|
৫৬
|
PBS INSTRUCTION 100-65
|
বাপবিবো/পবিস এর উপদেষ্ঠা প্রতিষ্ঠানকে জিআইএস ইকুইপমেন্ট ও মালামাল ভাড়া ও সেবা প্রদান নীতিমালা
|
|
৫৭
|
PBS INSTRUCTION 100-66/
BREB INSTRUCTION 500-29
|
বাপবিবো/পবিস কর্তৃক ক্রয়তব্য বৈদ্যুতিক লাইন/ উপকেন্দ্রের মালামাল পরীক্ষা/ পরিদর্শণ নীতিমালা।
|
|
৫৮
|
PBS INSTRUCTION 100-67/
BREB INSTRUCTION 500-30
|
বাপবিবো/পবিস কর্তৃক সংগৃহীত বৈদ্যুতিক লাইন/ উপকেন্দ্র এবং অন্যান্য মালামাল ও যন্ত্রপাতির প্যাকিং বক্স/ রীল/ ক্যাবল ড্রাম/ গানি ব্যাগ ইত্যাদি পরিদর্শণ নীতিমালা।
|
|
৫৯
|
PBS INSTRUCTION 100-68/
BREB INSTRUCTION 500-31
|
বাপবিবো কর্তৃক বিভিন্ন প্রকল্পের বিপরীতে এবং পবিস এর ডিপোজিট/ওএন্ডএম কাজের জন্য মালামাল সংগ্রহ প্রক্রিয়া
|
|
৬০
|
PBS INSTRUCTION 100-69/
BREB INSTRUCTION 500-27
|
Penalization Formula for Deviations Detected During Destination (Post-Landing) Inspection in Wood Poles, Anchor Logs and Cross arms of BREB/PBS
|
|
৬১
|
PBS INSTRUCTION 100-70
|
Line Construction Design
|
|
৬২
|
PBS INSTRUCTION 100-71
|
কারিগরী স্টাডি সম্পাদন, সুপারিশ প্রণয়ন এবং অনুমোদনের জন্য দিকনির্দেশনা
|
|
৬৩
|
PBS INSTRUCTION 100-72
|
নতুন বিদ্যুৎ সংযোগ ও লোড বৃদ্ধির ক্ষেত্রে অনুমোদন প্রক্রিয়া
|
|
৬৪
|
PBS INSTRUCTION 100-73
|
Procurement of Consultant for Software based Engineering Study of PBS Electric System
|
|
৬৫
|
PBS INSTRUCTION 100-74
|
পল্লী বিদ্যুৎ সমিতিসমূহের মধ্যে আদান-প্রদানকৃত মালামালের হিসাব সমন্বয় নীতিমালা
|
|
৬৬
|
PBS INSTRUCTION 100-75
|
Emergency Procedure and Disaster Management
|
|
৬৭
|
PBS INSTRUCTION 100-76
|
PalliBidyud Online Connection System
|
|
৬৮
|
PBS INSTRUCTION 100-77
|
Standard Specification and Drawings for Spacer Cable Line Construction
|
|
৬৯
|
PBS INSTRUCTION 100-78
|
Energy Auditing Policy
|
|