| ক্র: | সিরিজ নং | বিষয় | ডাউনলোড |
| ১ | PBS INSTRUCTION 100-01 | Engineering and Materials Administration |  |
| ২ | PBS INSTRUCTION 100-03 | Short Listing of Architectural & Engineering Consultants |  |
| ৩ | PBS INSTRUCTION 100-04 | Prequalification of Electrical Construction Contractor |  |
| ৪ | PBS INSTRUCTION 100-05 | Service, Repairing and Testing of Equipment/ Instrument of Electrical Network System |  |
| ৫ | PBS INSTRUCTION 100-06 | Construction Methods for PBS Electrical Network System, Building and Civil Works |  |
| ৬ | PBS INSTRUCTION 100-08 | Preparation of Plans and Specifications for Electrical Network Facilities for PBS |  |
| ৭ | PBS INSTRUCTION 100-09 | Appointment of Consultant for Local Electrical Consultancy Services |  |
| ৮ | PBS INSTRUCTION 100-10 | Pre-Construction and Construction Progress Co-Ordination Meeting |  |
| ৯ | PBS INSTRUCTION 100-12 | Function of BREB/PBS Engineers/Officers/Inspectors for Construction of Electric Network System and Civil Works |  |
| ১০ | PBS INSTRUCTION 100-13/ BREB INSTRUCTION 500-03 | Close-Out Procedure for the Contract Construction of Electrical Network System/Facilities |  |
| ১১ | PBS INSTRUCTION 100-14/ BREB INSTRUCTION 500-04 | Procedure and Documents for Closing Out the Civil Works (New & Maintenance) Construction Contract |  |
| ১২ | PBS INSTRUCTION 100-15 | Store Operation Manual |  |
| ১৩ | PBS INSTRUCTION 100-16 | Insurance Coverage and Bond Requirements for BREB/PBS’s Contractors |  |
| ১৪ | PBS INSTRUCTION 100-17 | PBS’s Sub-Station & Electric Line’s Materials and Transformer’s Repairing/ Servicing/ Testing |  |
| ১৫ | PBS INSTRUCTION 100-18 | Power Interruption Recording and Reporting Procedure |  |
| ১৬ | PBS INSTRUCTION 100-19/ BREB INSTRUCTION 300-49 | Load Management |  |
| ১৭ | PBS INSTRUCTION 100-20/ BREB INSTRUCTION 500-07 | Energization and Commissioning of Electric Network System (Electric Lines or Lines Section and Sub-Station) |  |
| ১৮ | PBS INSTRUCTION 100-21 | PBS INSTRUCTION 100-21 |  |
| ১৯ | PBS INSTRUCTION 100-22 | Adequate Grounding on PBS Distribution System |  |
| ২০ | PBS INSTRUCTION 100-23 | System Plans and Construction Works Plans for Electric Network Systems |  |
| ২১ | PBS INSTRUCTION 100-24 | Voltage and Current Investigations |  |
| ২৪ | PBS INSTRUCTION 100-25/ BREB INSTRUCTION 500-08 | Materials Coding Procedures |  |
| ২৫ | PBS INSTRUCTION 100-26/ PBS INSTRUCTION 300-05 | Power Factor Measurements |  |
| ২৬ | PBS INSTRUCTION 100-27 | Stores Management Manual |  |
| ২৭ | PBS INSTRUCTION 100-28 | Standard Specifications and Drawing for 6.35/11 KV Line Constructions |    |
| ২৮ | PBS INSTRUCTION 100-29 | Substation Operation, Inspection and Maintenance |   |
| ২৯ | PBS INSTRUCTION 100-30 | Distribution Operation, Inspection and Maintenance |  |
| ৩০ | PBS INSTRUCTION 100-31/ BREB INSTRUCTION 500-05 | Responsibilities of BREB and PBS for Operation, Construction & Outage of Electric Network System |  |
| ৩১ | PBS INSTRUCTION 100-32 | Tool and Work Equipment Administration |  |
| ৩২ | PBS INSTRUCTION 100-33/ BREB INSTRUCTION 500-06 | Material Administration Policies and Responsibilities |  |
| ৩৩ | PBS INSTRUCTION 100-35 | বিতরণ ট্রান্সফরমার স্থাপন, প্রতি স্থাপন, আপগ্রেডিং ও ভাড়ায় ব্যবহার বিষয়ে নীতিমালা |  |
| ৩৪ | PBS INSTRUCTION 100-37/ BREB INSTRUCTION 500-09 | Electrical System Take Over Policy and Procedure |  |
| ৩৫ | PBS INSTRUCTION 100-38 | Management of Consumer Complaints |  |
| ৩৬ | PBS INSTRUCTION 100-39/ BREB INSTRUCTION 500-10 | Standards for the Power Utilization of Three-Phase Meters |  |
| ৩৭ | PBS INSTRUCTION 100-40 | Meter Installation, Test, Repair and Sealing Policy |  |
| ৩৮ | PBS INSTRUCTION 100-41 | Construction/Rehabilitation of Electric Facilities by PBS |  |
| ৩৯ | PBS INSTRUCTION 100-42/ BREB INSTRUCTION 500-11 | Extension of Electrical Lines on Deposit Work Basis |  |
| ৪০ | PBS INSTRUCTION 100-45 | Standard Specifications and Drawing for 33 KV Line Constructions |   |
| ৪১ | PBS INSTRUCTION 100-47 | Inter Project Materials Transaction Policy |  |
| ৪২ | PBS INSTRUCTION 100-49 | PBS Hot Line Work Administration |  |
| ৪৩ | PBS INSTRUCTION 100-50 | PBS Hot Line Work Operations |  |
| ৪৪ | PBS INSTRUCTION 100-51/ BREB INSTRUCTION 700-13 | First in First Out Material Issue |  |
| ৪৫ | PBS INSTRUCTION 100-52 | |  |
| ৪৬ | PBS INSTRUCTION 100-53/ BREB INSTRUCTION 500-22 | Storage and Handing of Timer Products |  |
| ৪৭ | PBS INSTRUCTION 100-54/ BREB INSTRUCTION 500-25 | Standard for Inspection, Evaluation and Treatment of Standing Wood Poles |  |
| ৪৮ | PBS INSTRUCTION 100-57 | পবিসসমূহের প্রকল্প বহির্ভূত এবং নিজস্ব অর্থায়নে পূর্ত নির্মান/ রক্ষাণাবেক্ষণ কাজ সম্পাদনের নীতিমালা ও পদ্ধতি |  |
| ৪৯ | PBS INSTRUCTION 100-58 | পল্লী বিদ্যুৎ সমিতিসমূহ কর্তৃক পরিচালন, রক্ষাণাবেক্ষণ ও সিস্টেম উনয়ন কাজের মালামাল ক্রয় নীতিমালা |  |
| ৫০ | PBS INSTRUCTION 100-59/ PBS INSTRUCTION 300-60 | Engineering & Operations Record Update Process |  |
| ৫১ | PBS INSTRUCTION 100-60 | Development and Management of GIS for PBS Service Area |  |
| ৫২ | PBS INSTRUCTION 100-61 | Guideline for Engineering Assessment of Taken-Over Facilities from other Utilities/ Companies/Organizations |  |
| ৫৩ | PBS INSTRUCTION 100-62 | Procurement of GIS Developer Consultant |  |
| ৫৪ | PBS INSTRUCTION 100-63 | Procurement of GIS Updating Consultant |  |
| ৫৫ | PBS INSTRUCTION 100-64 | পল্লী বিদ্যুৎ সমিতিসমূহ কর্তৃক ডিপোজিট ওয়ার্কের মালামাল ক্রয় নীতিমালা |  |
| ৫৬ | PBS INSTRUCTION 100-65 | বাপবিবো/পবিস এর উপদেষ্ঠা প্রতিষ্ঠানকে জিআইএস ইকুইপমেন্ট ও মালামাল ভাড়া ও সেবা প্রদান নীতিমালা |  |
| ৫৭ | PBS INSTRUCTION 100-66/ BREB INSTRUCTION 500-29 | বাপবিবো/পবিস কর্তৃক ক্রয়তব্য বৈদ্যুতিক লাইন/ উপকেন্দ্রের মালামাল পরীক্ষা/ পরিদর্শণ নীতিমালা। |  |
| ৫৮ | PBS INSTRUCTION 100-67/ BREB INSTRUCTION 500-30 | বাপবিবো/পবিস কর্তৃক সংগৃহীত বৈদ্যুতিক লাইন/ উপকেন্দ্র এবং অন্যান্য মালামাল ও যন্ত্রপাতির প্যাকিং বক্স/ রীল/ ক্যাবল ড্রাম/ গানি ব্যাগ ইত্যাদি পরিদর্শণ নীতিমালা। |  |
| ৫৯ | PBS INSTRUCTION 100-68/ BREB INSTRUCTION 500-31 | বাপবিবো কর্তৃক বিভিন্ন প্রকল্পের বিপরীতে এবং পবিস এর ডিপোজিট/ওএন্ডএম কাজের জন্য মালামাল সংগ্রহ প্রক্রিয়া |  |
| ৬০ | PBS INSTRUCTION 100-69/ BREB INSTRUCTION 500-27 | Penalization Formula for Deviations Detected During Destination (Post-Landing) Inspection in Wood Poles, Anchor Logs and Cross arms of BREB/PBS |  |
| ৬১ | PBS INSTRUCTION 100-70 | Line Construction Design |   |
| ৬২ | PBS INSTRUCTION 100-71 | কারিগরী স্টাডি সম্পাদন, সুপারিশ প্রণয়ন এবং অনুমোদনের জন্য দিকনির্দেশনা |  |
| ৬৩ | PBS INSTRUCTION 100-72 | নতুন বিদ্যুৎ সংযোগ ও লোড বৃদ্ধির ক্ষেত্রে অনুমোদন প্রক্রিয়া |  |
| ৬৪ | PBS INSTRUCTION 100-73 | Procurement of Consultant for Software based Engineering Study of PBS Electric System |  |
| ৬৫ | PBS INSTRUCTION 100-74 | পল্লী বিদ্যুৎ সমিতিসমূহের মধ্যে আদান-প্রদানকৃত মালামালের হিসাব সমন্বয় নীতিমালা |  |
| ৬৬ | PBS INSTRUCTION 100-75 | Emergency Procedure and Disaster Management |  |
| ৬৭ | PBS INSTRUCTION 100-76 | PalliBidyud Online Connection System |  |
| ৬৮ | PBS INSTRUCTION 100-77 | Standard Specification and Drawings for Spacer Cable Line Construction |  |
| ৬৯ | PBS INSTRUCTION 100-78 | Energy Auditing Policy |  |